Project RDP-2026-003

Marine Epoxy Repair Compound

ALL REQUIREMENTS PASSEDSuccessful
Family
Epoxy Putties
Stage
Validation Candidate
Lead
Esi Lead
Director
Yaw Director
Target release
2026-09-30
Confidentiality
restricted

Objective

Technical and commercial objectives, kept side by side so a requirement change can be judged against both.

Technical

Sustained adhesion after 1000 h salt-spray exposure.

Commercial

Enter the marine repair segment with one SKU.

Stage gate

Built from the project's stage HISTORY, not from a single current-stage field. That is what lets a project move backwards into Failure / Rework without the record of where it has been being overwritten.

  1. 1. Requirements
    2026-01-08 → 2026-02-02
  2. 2. Research
    2026-02-02 → 2026-03-06
  3. 3. Materials
    2026-03-06 → 2026-04-01
  4. 4. Formulation
    2026-04-01 → 2026-05-13
  5. 5. Laboratory
    2026-05-13 → 2026-06-10
  6. 6. Testing
    2026-06-10 → 2026-07-01
  7. 7. Failure / Rework
    2026-07-01 → 2026-08-05
  8. 8. Validation Candidate
    2026-08-05 → in progress

Requirements verification matrix

Every requirement with its target, the measurement taken against it, the method used, and the derived verification state. The state is computed from the measurement — it is never a field anyone sets.

Requirements for RDP-2026-003
TargetMeasuredVerification
REQ-003-01Adhesion after salt spraycriticaltarget 5.0 · min 4.0 MPa4.6 MPaASTM B117PASSSuccessful
REQ-003-02Water absorptionhightarget 0.5 · max 1.0 %0.7 %ASTM D570PASSSuccessful

Milestones

  • Root cause acceptedplanned 2026-07-31 · actual 2026-08-05COMPLETESuccessful
  • Validation candidate nominatedplanned 2026-08-28IN PROGRESSConditional. Planned for 2026-08-28; not yet complete.Planned for 2026-08-28; not yet complete.

Risks

  • RSK-003-01Salt-spray result not yet reproduced on the reworked formulaowner Kofi EngineerELEVATEDConditional. medium probability, high impact — mitigation in progress.medium probability, high impact — mitigation in progress.

    Mitigation: Repeat exposure running to 1000 h with duplicate panels.

Team

  • Esi Lead
    Project Lead
  • Kofi Engineer
    Test Engineer
  • Akua QA
    QA Reviewer