Demonstration data — every project, requirement, measurement and person shown here is synthetic. Nothing on this site is a real R&D record.
Marine Epoxy Repair Compound
- Family
- Epoxy Putties
- Stage
- Validation Candidate
- Lead
- Esi Lead
- Director
- Yaw Director
- Target release
- 2026-09-30
- Confidentiality
- restricted
Objective
Technical and commercial objectives, kept side by side so a requirement change can be judged against both.
Sustained adhesion after 1000 h salt-spray exposure.
Enter the marine repair segment with one SKU.
Stage gate
Built from the project's stage HISTORY, not from a single current-stage field. That is what lets a project move backwards into Failure / Rework without the record of where it has been being overwritten.
- ✓ 1. Requirements2026-01-08 → 2026-02-02
- ✓ 2. Research2026-02-02 → 2026-03-06
- ✓ 3. Materials2026-03-06 → 2026-04-01
- ✓ 4. Formulation2026-04-01 → 2026-05-13
- ✓ 5. Laboratory2026-05-13 → 2026-06-10
- ✕ 6. Testing2026-06-10 → 2026-07-01
- ✓ 7. Failure / Rework2026-07-01 → 2026-08-05
- ● 8. Validation Candidate2026-08-05 → in progress
Requirements verification matrix
Every requirement with its target, the measurement taken against it, the method used, and the derived verification state. The state is computed from the measurement — it is never a field anyone sets.
| Target | Measured | Verification | ||||
|---|---|---|---|---|---|---|
| REQ-003-01 | Adhesion after salt spray | critical | target 5.0 · min 4.0 MPa | 4.6 MPa | ASTM B117 | PASSSuccessful |
| REQ-003-02 | Water absorption | high | target 0.5 · max 1.0 % | 0.7 % | ASTM D570 | PASSSuccessful |
Milestones
- Root cause acceptedplanned 2026-07-31 · actual 2026-08-05COMPLETESuccessful
- Validation candidate nominatedplanned 2026-08-28IN PROGRESSConditional. Planned for 2026-08-28; not yet complete.Planned for 2026-08-28; not yet complete.
Risks
- RSK-003-01Salt-spray result not yet reproduced on the reworked formulaowner Kofi EngineerELEVATEDConditional. medium probability, high impact — mitigation in progress.medium probability, high impact — mitigation in progress.
Mitigation: Repeat exposure running to 1000 h with duplicate panels.
Team
- Esi LeadProject Lead
- Kofi EngineerTest Engineer
- Akua QAQA Reviewer