Demonstration data every project, requirement, measurement and person shown here is synthetic. Nothing on this site is a real R&D record.

Project RDP-2026-009

High-Build Polyester Primer

IN VERIFICATIONConditional. 2 requirement(s) not yet confirmed.2 requirement(s) not yet confirmed.
Family
Primers
Stage
Formulation
Lead
Esi Lead
Director
Yaw Director
Target release
2027-02-26
Confidentiality
normal

Objective

Technical and commercial objectives, kept side by side so a requirement change can be judged against both.

Technical

Increase film build per coat without sag on vertical panels.

Commercial

Reduce coats required from three to two.

Stage gate

Built from the project's stage HISTORY, not from a single current-stage field. That is what lets a project move backwards into Failure / Rework without the record of where it has been being overwritten.

  1. 1. Requirements
    2026-05-11 → 2026-06-05
  2. 2. Research
    2026-06-05 → 2026-07-03
  3. 3. Materials
    2026-07-03 → 2026-08-04
  4. 4. Formulation
    2026-08-04 → in progress
  5. 5. Laboratory
    not entered
  6. 6. Testing
    not entered
  7. 7. Failure / Rework
    not entered
  8. 8. Validation Candidate
    not entered

Requirements verification matrix

Every requirement with its target, the measurement taken against it, the method used, and the derived verification state. The state is computed from the measurement — it is never a field anyone sets.

Requirements for RDP-2026-009
TargetMeasuredVerification
REQ-009-01Film build per coatcriticaltarget 150 · min 120 umnot measuredASTM D7091NOT MEASUREDConditional. No measurement recorded yet — this requirement is unverified.No measurement recorded yet — this requirement is unverified.
REQ-009-02Sag at 200 umhightarget 0 · max 2 mmnot measuredASTM D4400NOT MEASUREDConditional. No measurement recorded yet — this requirement is unverified.No measurement recorded yet — this requirement is unverified.

Milestones

  • Requirement set approvedplanned 2026-06-05 · actual 2026-06-05COMPLETESuccessful
  • Candidate formula submittedplanned 2026-09-18IN PROGRESSConditional. Planned for 2026-09-18; not yet complete.Planned for 2026-09-18; not yet complete.

Risks

  • RSK-009-01Sag resistance may limit achievable buildowner Ama ChemistMODERATEStatus

    Mitigation: Rheology modifier screen scheduled.

Team

  • Esi Lead
    Project Lead
  • Ama Chemist
    Lead Chemist