Demonstration data — every project, requirement, measurement and person shown here is synthetic. Nothing on this site is a real R&D record.
High-Build Polyester Primer
- Family
- Primers
- Stage
- Formulation
- Lead
- Esi Lead
- Director
- Yaw Director
- Target release
- 2027-02-26
- Confidentiality
- normal
Objective
Technical and commercial objectives, kept side by side so a requirement change can be judged against both.
Increase film build per coat without sag on vertical panels.
Reduce coats required from three to two.
Stage gate
Built from the project's stage HISTORY, not from a single current-stage field. That is what lets a project move backwards into Failure / Rework without the record of where it has been being overwritten.
- ✓ 1. Requirements2026-05-11 → 2026-06-05
- ✓ 2. Research2026-06-05 → 2026-07-03
- ✓ 3. Materials2026-07-03 → 2026-08-04
- ● 4. Formulation2026-08-04 → in progress
- ○ 5. Laboratorynot entered
- ○ 6. Testingnot entered
- ○ 7. Failure / Reworknot entered
- ○ 8. Validation Candidatenot entered
Requirements verification matrix
Every requirement with its target, the measurement taken against it, the method used, and the derived verification state. The state is computed from the measurement — it is never a field anyone sets.
| Target | Measured | Verification | ||||
|---|---|---|---|---|---|---|
| REQ-009-01 | Film build per coat | critical | target 150 · min 120 um | not measured | ASTM D7091 | NOT MEASUREDConditional. No measurement recorded yet — this requirement is unverified.No measurement recorded yet — this requirement is unverified. |
| REQ-009-02 | Sag at 200 um | high | target 0 · max 2 mm | not measured | ASTM D4400 | NOT MEASUREDConditional. No measurement recorded yet — this requirement is unverified.No measurement recorded yet — this requirement is unverified. |
Milestones
- Requirement set approvedplanned 2026-06-05 · actual 2026-06-05COMPLETESuccessful
- Candidate formula submittedplanned 2026-09-18IN PROGRESSConditional. Planned for 2026-09-18; not yet complete.Planned for 2026-09-18; not yet complete.
Risks
- RSK-009-01Sag resistance may limit achievable buildowner Ama ChemistMODERATEStatus
Mitigation: Rheology modifier screen scheduled.
Team
- Esi LeadProject Lead
- Ama ChemistLead Chemist