Demonstration data every project, requirement, measurement and person shown here is synthetic. Nothing on this site is a real R&D record.

Project RDP-2026-014

Premium Lightweight Automotive Putty

1 REQUIREMENT FAILEDFailed
Family
Polyester Fillers
Stage
Testing
Lead
Esi Lead
Director
Yaw Director
Target release
2026-11-30
Confidentiality
normal

Objective

Technical and commercial objectives, kept side by side so a requirement change can be judged against both.

Technical

Lower density than benchmark with sanding time below target.

Commercial

Hold price parity with the incumbent while reducing shipped weight.

Stage gate

Built from the project's stage HISTORY, not from a single current-stage field. That is what lets a project move backwards into Failure / Rework without the record of where it has been being overwritten.

  1. 1. Requirements
    2026-03-02 → 2026-03-27
  2. 2. Research
    2026-03-27 → 2026-04-21
  3. 3. Materials
    2026-04-21 → 2026-05-19
  4. 4. Formulation
    2026-05-19 → 2026-06-30
  5. 5. Laboratory
    2026-06-30 → 2026-07-28
  6. 6. Testing
    2026-07-28 → in progress
  7. 7. Failure / Rework
    not entered
  8. 8. Validation Candidate
    not entered

Requirements verification matrix

Every requirement with its target, the measurement taken against it, the method used, and the derived verification state. The state is computed from the measurement — it is never a field anyone sets.

Requirements for RDP-2026-014
TargetMeasuredVerification
REQ-014-01Cured densitycriticaltarget 1.15 · max 1.25 g/cm31.19 g/cm3ASTM D792PASSSuccessful
REQ-014-02Adhesion to aluminiumcriticaltarget 8.0 · min 6.5 MPa6.8 MPaASTM D4541PASS — LOW MARGINConditional. Measured 6.8 MPa against a minimum of 6.5 MPa — inside tolerance but below the warning threshold of 7 MPa.Measured 6.8 MPa against a minimum of 6.5 MPa — inside tolerance but below the warning threshold of 7 MPa.
REQ-014-03Sanding time at 20 Chightarget 20 · max 25 minutes22 minutesINT-SAND-01PASSSuccessful
REQ-014-04Sanding time at 5 Chightarget 30 · max 40 minutes47 minutesINT-SAND-01FAILFailed
REQ-014-05Cure shrinkagehightarget 0.30 · max 0.50 %not measuredINT-SHR-02NOT MEASUREDConditional. No measurement recorded yet — this requirement is unverified.No measurement recorded yet — this requirement is unverified.
REQ-014-06Storage stability at 40 Cmediumtarget 6 · min 6 monthsnot measuredINT-STAB-01NOT MEASUREDConditional. No measurement recorded yet — this requirement is unverified.No measurement recorded yet — this requirement is unverified.

Milestones

  • Requirement set approvedplanned 2026-03-27 · actual 2026-03-27COMPLETESuccessful
  • Candidate formula submittedplanned 2026-06-26 · actual 2026-06-30COMPLETESuccessful
  • First full test panel completeplanned 2026-08-22IN PROGRESSConditional. Planned for 2026-08-22; not yet complete.Planned for 2026-08-22; not yet complete.
  • Validation candidate nominatedplanned 2026-10-09NOT STARTEDStatus

Risks

  • RSK-014-01Micro-sphere supply is single-sourcedowner Abena ProcurementELEVATEDConditional. medium probability, high impact — mitigation in progress.medium probability, high impact — mitigation in progress.

    Mitigation: Second supplier qualification opened with Procurement.

  • RSK-014-02Sanding time may regress at low temperatureowner Kofi EngineerELEVATEDConditional. high probability, medium impact — no mitigation in progress yet.high probability, medium impact — no mitigation in progress yet.

    Mitigation: Low-temperature panel series added to the test plan.

  • RSK-014-03Density target conflicts with adhesion minimumowner Ama ChemistELEVATEDConditional. medium probability, high impact — no mitigation in progress yet.medium probability, high impact — no mitigation in progress yet.

    Mitigation: DOE planned across filler loading and coupling agent.

Team

  • Esi Lead
    Project Lead
  • Ama Chemist
    Lead Chemist
  • Kofi Engineer
    Test Engineer
  • Kwesi Technician
    Lab Technician
  • Akua QA
    QA Reviewer